ISO 7870-2:2013Withdrawn

Control charts — Part 2: Shewhart control charts

Cartes de contrôle — Partie 2: Cartes de contrôle de Shewhart

This edition has been replaced by ISO 7870-2:2023.

Abstract / scope

ISO 7870-2:2013 establishes a guide to the use and understanding of the Shewhart control chart approach to the methods for statistical control of a process.

ISO 7870-2:2013 is limited to the treatment of statistical process control methods using only the Shewhart system of charts. Some supplementary material that is consistent with the Shewhart approach, such as the use of warning limits, analysis of trend patterns and process capability is briefly introduced. There are, however, several other types of control chart procedures, a general description of which can be found in ISO 7870-1.

Life cycle

Replaces

ISO 8258:1991WithdrawnShewhart control chartsInternational Standard · Published 12 Dec 1991 · ISO/TC 69/SC 4ISO 8258:1991/Cor 1:1993WithdrawnShewhart control charts — Technical Corrigendum 1International Standard · Published 8 Apr 1993 · ISO/TC 69/SC 4

Replaced by

ISO 7870-2:2023PublishedControl charts — Part 2: Shewhart control chartsInternational Standard · Published 14 Mar 2023 · ISO/TC 69/SC 4