ISO/TR 26762:2008Withdrawn

Natural gas — Upstream area — Allocation of gas and condensate

Gaz naturel — Zone amont — Allocation du gaz et du condensat

This edition has been replaced by ISO/TS 26762:2025.

Abstract / scope

ISO/TR 26762:2008 describes the production measurements, in terms of both hardware and procedures, that can be used to allocate the gas and condensate back to the individual concessions, reservoirs and wells in a fair and equitable way. The objective is to give an approach that is recognized to be current best practice and that has a wide support in the oil and gas industry.

Life cycle

Replaced by

ISO/NP TR 26762Deleted (project abandoned)Natural gas — Upstream area — Allocation of gas and condensateTechnical Report · ISO/TC 193/SC 3ISO/CD TR 26762Deleted (project abandoned)Design & operation of allocation systems used in gas productions facilitiesTechnical Report · ISO/TC 193/SC 3ISO/TS 26762:2025PublishedDesign and operation of allocation systems used in gas productions facilitiesTechnical Specification · Published 21 Apr 2025 · ISO/TC 193/SC 3