ISO/TR 21245-2:2016Withdrawn

Railway applications — Rail project planning process — Part 2: Conditions

Applications ferroviaires - Processus de planification de projets ferroviaires — Partie 2: Conditions

This edition has been replaced by ISO/TR 21245:2018.

Abstract / scope

ISO/TR 21245-2:2016 aims to identify basic conditions of rail projects, which are essential input for the design of rail systems. This document does not interfere with existing national and local laws, legal requirements and regulations. It considers only the "planning stage" of rail projects and does not deal with the "execution stage". Any type of rail projects is intended to be dealt with, such as building a new line, retrofitting or upgrading of existing lines and change of operation or maintenance.

In ISO/TR 21245-2:2016, conditions are dealt with as premises or constraints, which can be difficult to adjust or change by stakeholders concerned in the project.

Life cycle

Replaced by

ISO/TR 21245:2018PublishedRailway applications — Railway project planning process — Guidance on railway project planningTechnical Report · Published 3 Dec 2018 · ISO/TC 269